Successful Projects in the Bridges
Foot over bridges, ROBs, flyovers and cable-stayed bridges designed and checked by Syntegrity.
Bridges
Bridge design consultants in India
Syntegrity Consulting designs and checks bridges of every common type: foot over bridges (FOBs), road over bridges (ROBs), flyovers, river and nallah bridges, PSC box-girder bridges and cable-stayed bridges.
We have worked on more than 25 bridges and FOBs for BMC, MMRDA, MMRC, PWD Maharashtra, NHAI and Western Railway, providing detailed design, proof checking and construction support.
- Detailed design of FOBs, ROBs, flyovers and vehicular bridges
- Steel, steel-composite, RCC and PSC box-girder superstructures
- Cable-stayed bridge design
- Proof checking and third-party design review
- Feasibility studies, DPRs and construction support
Key projects
- Cable-stayed bridge, Oshiwara, Mumbai238 m long with spans of 56 + 126 + 56 m, 6 lanes, steel-composite girder and RCC pylon.
- Mumbai Coastal Road, Bridge ARM 4 & 5PSC box-girder bridge. Detail design and construction support for BMC.
- ROB on Western Bypass, Nanded3.244 km road over bridge. Proof Checking Consultant for PWD Maharashtra.
- NH-79A / NH-79 six-laning, Rajasthan (NHAI)Detailed Design Consultant for 1 major bridge, 17 minor bridges and 5 flyovers over 90 km.
- 15 foot over bridges in Mumbai and GujaratFor BMC, MMRDA, MMRC and Western Railway, including metro station links on Lines 6, 7 and 7A and two CSMIA Terminal 2 connections.
Frequently asked questions
What types of bridges does Syntegrity design?
Foot over bridges, road over bridges, flyovers, river and nallah bridges, PSC box-girder bridges and cable-stayed bridges, in steel, steel-composite, RCC and prestressed concrete.
Which bridge projects has Syntegrity worked on?
Projects include the 238 m cable-stayed bridge at Oshiwara, Bridge ARM 4 & 5 on the Mumbai Coastal Road, proof checking of the 3.244 km Nanded ROB, 23 bridges and flyovers on NHAI's NH-79A / NH-79 in Rajasthan, and 15 foot over bridges for BMC, MMRDA, MMRC and Western Railway.
Does Syntegrity proof-check bridge designs?
Yes. Syntegrity was the Proof Checking Consultant for the 3.244 km ROB on the Western Bypass at Nanded for PWD Maharashtra.
How do I contact Syntegrity about a bridge project?
Email info@syntegrity.co.in or call +91 99207 21777.
You need the right direction
for your business, we’ll help you do that.
Address Business
302 ,UK Sangfroid , Off Veera
Desai Road, Andheri West,
Mumbai – 400 053
Why Partner with Us?
Our Featured Clients

















