Syntegrity Consulting provided detailed design for the PSC box girder bridge (ARM 4 & 5) at Mumbai Coastal Road, for Brihanmumbai Municipal Corporation (BMC).
Project at a glance
| Client | Brihanmumbai Municipal Corporation (BMC) |
|---|---|
| Location | Mumbai Coastal Road |
| Structure | PSC box girder bridge (ARM 4 & 5) |
| Year | 2020 |
| Status | Completed |
| Syntegrity’s role | Detailed design |
What Syntegrity did
- Detailed design: structural analysis, design calculations and construction drawings for the superstructure, substructure and foundations.
Related projects
- ROB , Nanded
- Bridge across Dahisar River near Ratan Nagar, Borivali (E), Mumbai
- Bridge near Pushpa Park, Kurar Village, Mumbai
- NHAI West Bengal
Planning a similar project? Email info@syntegrity.co.in.