Bridge ARM 4 & 5 – PSC Box Girder for Mumbai Coastal Road

Syntegrity Consulting provided detailed design for the PSC box girder bridge (ARM 4 & 5) at Mumbai Coastal Road, for Brihanmumbai Municipal Corporation (BMC).

Project at a glance

Client Brihanmumbai Municipal Corporation (BMC)
Location Mumbai Coastal Road
Structure PSC box girder bridge (ARM 4 & 5)
Year 2020
Status Completed
Syntegrity’s role Detailed design

What Syntegrity did

  • Detailed design: structural analysis, design calculations and construction drawings for the superstructure, substructure and foundations.

Related projects

Planning a similar project? Email info@syntegrity.co.in.