Syntegrity Consulting provided detailed design and construction support for the foot over bridge for airport connectivity at CSMIA Terminal 2, Mumbai, for Mumbai Metro Rail Corporation (MMRCL).
Project at a glance
| Client | Mumbai Metro Rail Corporation (MMRCL) |
|---|---|
| Location | CSMIA Terminal 2, Mumbai |
| Structure | Foot over bridge for airport connectivity |
| Size | approx. 120 m |
| Year | 2024 |
| Status | Completed |
| Syntegrity’s role | Detailed design and construction support |
What Syntegrity did
- Detailed design: structural analysis, design calculations and construction drawings for the superstructure, substructure and foundations.
- Construction support: answering site queries, reviewing the contractor’s fabrication, erection and temporary-works proposals, and revising details where site conditions required.
About the project
Foot over bridges at metro stations let passengers reach neighbourhoods, bus stops and other transport lines without crossing busy roads at grade. They have to be planned around the station’s entry points, the road below and the services underground, and are usually erected in short night-time traffic blocks so the road and the metro keep running.
Related projects
- FOB across Dahisar River connecting WEH and Ratan Nagar, Mumbai
- FOB across Nallah at Shankar Lane, Kandivali (W), Mumbai
- FOB at Adarsh Nagar for MML-6
- FOB connecting T2 Airport to MML-3 Station & MML-7A
Planning a similar project? Email info@syntegrity.co.in.
