FOB for T2 Connectivity with CSMIA Airport, Mumbai

Syntegrity Consulting provided detailed design and construction support for the foot over bridge for airport connectivity at CSMIA Terminal 2, Mumbai, for Mumbai Metro Rail Corporation (MMRCL).

Project at a glance

Client Mumbai Metro Rail Corporation (MMRCL)
Location CSMIA Terminal 2, Mumbai
Structure Foot over bridge for airport connectivity
Size approx. 120 m
Year 2024
Status Completed
Syntegrity’s role Detailed design and construction support

What Syntegrity did

  • Detailed design: structural analysis, design calculations and construction drawings for the superstructure, substructure and foundations.
  • Construction support: answering site queries, reviewing the contractor’s fabrication, erection and temporary-works proposals, and revising details where site conditions required.

About the project

Foot over bridges at metro stations let passengers reach neighbourhoods, bus stops and other transport lines without crossing busy roads at grade. They have to be planned around the station’s entry points, the road below and the services underground, and are usually erected in short night-time traffic blocks so the road and the metro keep running.