FOB at JVLR for MML-6

Syntegrity Consulting is providing detailed design and construction support for the foot over bridge for Mumbai Metro Line 6 at JVLR, Mumbai, for Mumbai Metropolitan Region Development Authority (MMRDA).

Project at a glance

Client Mumbai Metropolitan Region Development Authority (MMRDA)
Location JVLR, Mumbai
Structure Foot over bridge for Mumbai Metro Line 6
Size approx. 175 m
Year 2025
Status Under construction
Syntegrity’s role Detailed design and construction support

What Syntegrity did

  • Detailed design: structural analysis, design calculations and construction drawings for the superstructure, substructure and foundations.
  • Construction support: answering site queries, reviewing the contractor’s fabrication, erection and temporary-works proposals, and revising details where site conditions required.

About the project

Foot over bridges at metro stations let passengers reach neighbourhoods, bus stops and other transport lines without crossing busy roads at grade. They have to be planned around the station’s entry points, the road below and the services underground, and are usually erected in short night-time traffic blocks so the road and the metro keep running.