Tunnels

successful project

Successful Projects in the Tunnels

Underground stations, metro tunnels and pedestrian subways designed and checked by Syntegrity.

Mumbai Metro Line 7A – TBM Dhruv tunnelling
Mumbai Metro Line 7A/9
Underground and elevated extension of Mumbai's metro network for MMRDA – Line 7A's 3.8 km underground link from Andheri East to CSMIA Terminal 2, and…
Pedestrian Subway / Vestibule – Science Centre Metro Station to Worli Promenade
Pedestrian Subway / Vestibule – Science Centre Metro Station via Mahalaxmi Racecourse to Worli Promenade
Syntegrity Consulting is providing detailed design, architectural design and MEPF design for the pedestrian subway and vestibule connecting Science Centre Metro Station, via Mahalaxmi Racecourse,…
Pedestrian Subway at Regal Cinema
Pedestrian Subway at Regal Cinema
Syntegrity Consulting is providing detailed design, construction support, architectural design and MEPF design for the pedestrian subway at Regal Cinema junction, South Mumbai, for Brihanmumbai…
Pedestrian Subway – CSMT Station to Walchand Road & BEST Bus Station
Pedestrian Subway – CSMT Railway Station to Walchand Road & BEST Bus Station
Syntegrity Consulting is providing detailed design, construction support, architectural design and MEPF design for the pedestrian subway connecting CSMT Railway Station with Walchand Road and…
HSR BKC Terminal – 2.7 km Long Continuous Tunnel Completed with First Breakthrough in 21 km Tunnel between BKC and Shilphata for Mumbai Ahmedabad Bullet Train Project
HSR BKC Terminal
Syntegrity Consulting provided detailed design and design review of the enabling and temporary works for the high-speed rail terminal at Bandra Kurla Complex (BKC), Mumbai,…

Tunnels & underground structures

Tunnel and underground design consultants in India

Syntegrity Consulting is a Mumbai-based civil and structural engineering consultancy that designs and checks underground infrastructure across India: underground metro and high-speed rail stations, cut-and-cover structures, pedestrian subways, station vestibules and material-handling tunnels.

Since 1999 our engineers have worked on underground projects for MMRDA, MMRCL, MCGM (BMC) and contractors such as J Kumar Infraprojects, from concept and detailed design to proof checking and construction support on site.

  • Detailed design of underground stations, subways and vestibules
  • Cut-and-cover and RCC box structures
  • Design checking and proof checking of metro works
  • Enabling works, temporary works and utility diversions
  • Construction support and site supervision

Key projects

  1. BKC underground station, Mumbai–Ahmedabad High Speed Rail (C1)Design review and support consultant for the only underground station on India's bullet-train corridor: about 1 km long, platforms 24–30 m below ground.
  2. Mumbai Metro Line 7A / 9, MMRDALead Design Checker, including Line 7A's 3.8 km underground link from Andheri East to CSMIA Terminal 2.
  3. Science Centre Metro Station to Worli PromenadeAbout 1,500 m pedestrian subway and vestibule via Mahalaxmi Racecourse. Design and construction support for J Kumar Infraprojects / MMRCL.
  4. Regal Cinema and CSMT pedestrian subways, MCGMAbout 300 m and 200 m subways in South Mumbai. Design, construction support and supervision.
  5. Dibba Bulk Handling Terminal, Fujairah, UAEStructural design of material-handling tunnels.

Frequently asked questions

What tunnel and underground projects has Syntegrity designed?

Syntegrity is the design review and support consultant for the BKC underground station on the Mumbai–Ahmedabad High Speed Rail (Package C1), Lead Design Checker for Mumbai Metro Line 7A / 9 including its underground section, and designer of pedestrian subways in Mumbai: Science Centre to Worli Promenade (about 1,500 m), Regal Cinema (about 300 m) and CSMT to Walchand Road (about 200 m).

Does Syntegrity check or proof-check tunnel and metro designs?

Yes. Syntegrity is Lead Design Checker for MMRDA's Mumbai Metro Lines 7A and 9 and Third-Party Verification Engineer on the Mumbai–Ahmedabad High Speed Rail EW1 package.

Where does Syntegrity work?

Syntegrity is headquartered in Andheri West, Mumbai, and works on projects across India and overseas, including the UAE and the Maldives.

How do I contact Syntegrity about a tunnel or subway project?

Email info@syntegrity.co.in or call +91 99207 21777.

You need the right direction
for your business, we’ll help you do that.

Address Business

302 ,UK Sangfroid , Off Veera
Desai Road, Andheri West,
Mumbai – 400 053

Contact With Us

Call us: +91-9920721777

Why Partner with Us?

Infrastructure-Focused Design Expertise
Problem-Solving with Precision
Strategic Technical Analysis
Technical Support
Qualified, Multidisciplinary Team
Value Engineering

    Schedule a Free Consultation

    Step 1 Step 2 Step 3

    Schedule a Free Consultation

    Step 1 Step 2 Step 3

    Schedule a Free Consultation

    Step 1 Step 2 Step 3

    To better assist you, please describe how we can help.

    Recognized by the best

    Our Featured Clients

    Here are some of the companies Syntegrity has empowered to forge ahead with confidence