Syntegrity Consulting is providing detailed design and construction support for the foot over bridge at Davipada Metro Station (Line 7), for Mumbai Metropolitan Region Development Authority (MMRDA).
Project at a glance
| Client | Mumbai Metropolitan Region Development Authority (MMRDA) |
|---|---|
| Location | Davipada, Mumbai |
| Structure | Foot over bridge at Davipada Metro Station (Line 7) |
| Size | approx. 50 m |
| Year | 2025 |
| Status | Under construction |
| Syntegrity’s role | Detailed design and construction support |
What Syntegrity did
- Detailed design: structural analysis, design calculations and construction drawings for the superstructure, substructure and foundations.
- Construction support: answering site queries, reviewing the contractor’s fabrication, erection and temporary-works proposals, and revising details where site conditions required.
About the project
Foot over bridges at metro stations let passengers reach neighbourhoods, bus stops and other transport lines without crossing busy roads at grade. They have to be planned around the station’s entry points, the road below and the services underground, and are usually erected in short night-time traffic blocks so the road and the metro keep running.
Related projects
- FOB for T2 Connectivity with CSMIA Airport, Mumbai
- FOB across Dahisar River, Dahisar (W), Mumbai
- FOB across OC Mains, Pogaon, Bhiwandi
- FOB at JVLR for MML-6
Planning a similar project? Email info@syntegrity.co.in.