Syntegrity Consulting provided the feasibility study and DPR for the 4-lane vehicular bridge near Malad Subway, Mumbai, for Brihanmumbai Municipal Corporation (BMC).
Project at a glance
| Client | Brihanmumbai Municipal Corporation (BMC) |
|---|---|
| Location | Malad, Mumbai |
| Structure | 4-lane vehicular bridge |
| Year | 2024 |
| Status | Completed |
| Syntegrity’s role | Feasibility study and DPR |
What Syntegrity did
- Feasibility study and DPR: options, preliminary design and cost estimate to support the owner’s decision.
About the project
Vehicular bridges over Mumbai’s nallas and rivers are built in tight urban sites, with utilities, existing roads and monsoon flows all shaping the span arrangement and foundations.