Syntegrity Consulting carried out the detailed design of the foot over bridge across Joglekar Nalla, Kandivali, Mumbai, for Brihanmumbai Municipal Corporation (BMC).
Project at a glance
| Client | Brihanmumbai Municipal Corporation (BMC) |
|---|---|
| Location | Kandivali, Mumbai |
| Structure | Foot over bridge across a nalla |
| Size | approx. 60 m |
| Year | 2021 |
| Syntegrity’s role | Detailed design |
What Syntegrity did
- Detailed design: structural analysis, design calculations and construction drawings for the superstructure, substructure and foundations.
About the project
Foot over bridges across Mumbai’s rivers and nallas give residents a safe, direct crossing where the only alternative is a long detour. Pier positions and spans have to keep the waterway clear for monsoon flows, and foundations are planned around the channel and the services along its banks.
Related projects
- FOB across OC Mains, Pogaon, Bhiwandi
- FOB at JVLR for MML-6
- FOB Connection at Akurli Metro Station to SAI Grounds
- FOB for T2 Connectivity with CSMIA Airport, Mumbai
Planning a similar project? Email info@syntegrity.co.in.
