Cable Stayed Bridge

Project Specifications

Number of Lanes

6

Total Width

26.95 Meters

Total Length

238 meters

Span Configuration

56 m + 126 m + 56 m

Superstructure Type

Steel Composite Girder with Cable-Stayed System

Substructure

RCC Pylon

Foundation Type

1500 mm Diameter Pile Foundation

Approach Lengths

Left-Hand Side (LHS):

126 meters

Right-Hand Side (RHS):

148 meters

 

Cable-Stayed Bridge Project – Oshiwara

Cable Stayed Bridge – project image 1

This bridge features a modern cable-stayed design supported by RCC pylons and deep pile foundations. The central span of 126 meters ensures minimal disruption to the underlying terrain or waterbody, while composite steel girders enhance structural efficiency and speed of construction. The approaches have been engineered for smooth vehicular transition and integration with existing road networks.

Syntegrity Consulting carried out the pre-tender design and costing for a contractor bidding for the 238 m six-lane cable-stayed bridge at Oshiwara, Mumbai.

Project at a glance

Syntegrity’s clientA contractor (tender stage)
Project ownerBrihanmumbai Municipal Corporation (BMC)
LocationOshiwara, Mumbai
Structure6-lane cable-stayed bridge, steel composite girder on RCC pylons
Size238 m (56 m + 126 m + 56 m)
Year2024
Syntegrity’s rolePre-tender design and costing

What Syntegrity did

  • Pre-tender design: a structural scheme for the cable-stayed bridge, its pylons, foundations and approaches, developed far enough to price the work reliably.
  • Costing: quantities and a cost estimate to support the contractor’s bid.