Engaged as the Proof Checking Consultant for the construction of the Road Over Bridge (ROB) on the Western Bypass Road at Ch. 3/150 on SH-247 (Railway Ch. 345/900), spanning a length of 3.244 km in Nanded City, Maharashtra. As part of this critical infrastructure initiative, our scope involves rigorous verification and technical validation of all structural designs and construction drawings in accordance with relevant IRC, MoRTH, and Railway standards. Our role ensures design integrity, structural safety, and compliance with codal provisions before execution. Through detailed review and collaborative coordination with the design and executing agencies, we contribute to the delivery of a safe, efficient, and durable ROB that will significantly improve traffic flow and connectivity in the region.