Multi Modal Integration For Mumbai Metro Line 9
- Home Main
- Case Studies
- Multi Modal Integration For Mumbai Metro Line 9
Syntegrity Consulting Pvt. Ltd. is entrusted with comprehensive structural design services, including the preparation of General Arrangement Drawings (GADs) for eight Metro Stations on Mumbai Metro Line 9: Dahisar, Pandhurang Wadi, Miragaon, Kashigaon, Sai Baba Nagar, Meditiya Nagar, Shahid Bhagat Singh Garden, and Subhash Chandra Bose Stadium. The total length is approx. 15 kms for the Metro Integration. The scope includes design of Footpaths , roads , drains , street furniture , junction improvement schemes
In parallel, an extensive utility mapping exercise is being undertaken, covering a 250-meter radius from the Metro centerline of identified streets within the core project zone. This includes the identification and documentation of both at-grade and underground utilities, in collaboration with relevant government agencies and private stakeholders such as telecom operators and electricity providers. For underground proposals, special emphasis is placed on identifying critical conflicts and developing technically viable relocation plans to ensure seamless integration with the proposed urban infrastructure. The relocation strategy aligns with design objectives, maintaining service continuity while minimizing disruption. This multi-layered approach ensures holistic urban infrastructure development, combining mobility enhancement with intelligent utility management.