Syntegrity Consulting provided comprehensive structural and civil design services for the enabling works of the HSR Terminal at BKC, including:
- Staging & Formwork Design: For slabs, walls, and columns.
- Drainage & Utilities: Site drainage system and utility diversion planning.
- Temporary Works: Design for barricading, access ramps, temporary staircases, and internal roads.
- Foundation Design: For cranes, weighbridges, high masts, gantries, labour accommodation, and other site facilities.
- Structures: Muck buckets, water/septic tanks, sheds, human baskets, decks, and plants.
- Structural Fabrication & Stores: Design of sheds, fabrication yards, and storage areas.
This covered a total working area of approx. 44,394 m², including entry/exit structures, cut & cover tunnel, and atrium skylights.