Cable Stayed Bridge

Cable Stayed Bridge Home Main Project Specifications Number of Lanes 6 Total Width 26.95 Meters Total Length 238 meters Span Configuration 56 m + 126 m + 56 m Superstructure Type Steel Composite Girder with Cable-Stayed System Substructure RCC Pylon Foundation Type 1500 mm Diameter Pile Foundation Approach Lengths Left-Hand Side (LHS): 126 meters Right-Hand […]
Continue Reading

ROB , Nanded

Banka Nanded Bridge Home Main Project Specifications Location Nanded City, Taluka and District – Nanded, Maharashtra Total Length 3.244 km Client/Executing Agency PWD Maharashtra ROB on Western Bypass Road at Ch. 3/150 on SH-247 (Railway Ch. 345/900) Engaged as the Proof Checking Consultant for the construction of the Road Over Bridge (ROB) on the Western […]
Continue Reading

SION Bridge

SION Bridge Home Main FEASIBILITY STUDY / DPR FOR SION GTB NAGAR ROB As part of Mumbai’s infrastructure upgrade initiative, two critical Rail Over Bridges (ROBs) were proposed over the Harbour Railway Line to ease traffic congestion, improve connectivity, and ensure pedestrian safety in densely populated areas of F/N Ward: GTB Nagar ROB Alignment: From […]
Continue Reading

Borivali – Daulat Nagar Bridge

Borivali – Daulat Nagar Bridge Home Main Project Specifications Total Bridge Length 36 meters (4 spans of 9 meters each)   Type of Bridge Steel Girders with RCC Deck   Carriageway Width Two Lanes   Foundation Type Open Foundation   Substructure RCC Piers (1.0-meter diameter)   Superstructure Steel Girders supporting RCC Deck   Syntegrity Consulting […]
Continue Reading

SNDT Bridge

SNDT Bridge Home Main Salient Features of the Project: Length of Bridge: 18 meters Type of Bridge: RCC Deck supported on 2 m dia. Secant Piles Width of Carriageway: 30 meters Type of Foundation & Substructure: Secant Piles Type of Superstructure: RCC Deck, 950 mm thick   This bridge structure demonstrates our expertise in foundation […]
Continue Reading

Categories

  • No categories

Latest Posts