Syntegrity Consulting provided detailed design and construction support for the foot over bridge across water mains at Pogaon, Bhiwandi, for Brihanmumbai Municipal Corporation (BMC).
Project at a glance
| Client | Brihanmumbai Municipal Corporation (BMC) |
|---|---|
| Location | Pogaon, Bhiwandi |
| Structure | Foot over bridge across water mains |
| Size | approx. 100 m |
| Year | 2023 |
| Status | Completed |
| Syntegrity’s role | Detailed design and construction support |
What Syntegrity did
- Detailed design: structural analysis, design calculations and construction drawings for the superstructure, substructure and foundations.
- Construction support: answering site queries, reviewing the contractor’s fabrication, erection and temporary-works proposals, and revising details where site conditions required.
About the project
This foot over bridge carries pedestrians over large water mains, where foundations must stay clear of the pipelines and their maintenance corridor.
Related projects
- FOB at Adarsh Nagar for MML-6
- FOB connecting T2 Airport to MML-3 Station & MML-7A
- FOB Connection from Akurli North to Kandivali (E) Skywalk
- FOB across Dahisar River connecting WEH and Ratan Nagar, Mumbai
Planning a similar project? Email info@syntegrity.co.in.