FOB across OC Mains, Pogaon, Bhiwandi

Syntegrity Consulting provided detailed design and construction support for the foot over bridge across water mains at Pogaon, Bhiwandi, for Brihanmumbai Municipal Corporation (BMC).

Project at a glance

Client Brihanmumbai Municipal Corporation (BMC)
Location Pogaon, Bhiwandi
Structure Foot over bridge across water mains
Size approx. 100 m
Year 2023
Status Completed
Syntegrity’s role Detailed design and construction support

What Syntegrity did

  • Detailed design: structural analysis, design calculations and construction drawings for the superstructure, substructure and foundations.
  • Construction support: answering site queries, reviewing the contractor’s fabrication, erection and temporary-works proposals, and revising details where site conditions required.

About the project

This foot over bridge carries pedestrians over large water mains, where foundations must stay clear of the pipelines and their maintenance corridor.