Pedestrian Subway at Regal Cinema

Syntegrity Consulting is providing detailed design, construction support, architectural design and MEPF design for the pedestrian subway at Regal Cinema junction, South Mumbai, for Brihanmumbai Municipal Corporation (BMC).

Project at a glance

Client Brihanmumbai Municipal Corporation (BMC)
Location Regal Cinema junction, South Mumbai
Structure Pedestrian subway
Size approx. 300 m
Year 2025
Status Design stage
Syntegrity’s role Detailed design, construction support, architectural design and MEPF design

What Syntegrity did

  • Detailed design: structural analysis, design calculations and construction drawings for the subway structure, entrances and staircases.
  • Construction support: answering site queries, reviewing the contractor’s fabrication, erection and temporary-works proposals, and revising details where site conditions required.
  • Architecture: planning, layouts, elevations and finishes.
  • MEPF: mechanical, electrical, plumbing and fire-fighting services design.

Related projects

Planning a similar project? Email info@syntegrity.co.in.