Successful Projects in the Tunnels
Underground stations, metro tunnels and pedestrian subways designed and checked by Syntegrity.
Tunnels & underground structures
Tunnel and underground design consultants in India
Syntegrity Consulting is a Mumbai-based civil and structural engineering consultancy that designs and checks underground infrastructure across India: underground metro and high-speed rail stations, cut-and-cover structures, pedestrian subways, station vestibules and material-handling tunnels.
Since 1999 our engineers have worked on underground projects for MMRDA, MMRCL, MCGM (BMC) and contractors such as J Kumar Infraprojects, from concept and detailed design to proof checking and construction support on site.
- Detailed design of underground stations, subways and vestibules
- Cut-and-cover and RCC box structures
- Design checking and proof checking of metro works
- Enabling works, temporary works and utility diversions
- Construction support and site supervision
Key projects
- BKC underground station, Mumbai–Ahmedabad High Speed Rail (C1)Design review and support consultant for the only underground station on India's bullet-train corridor: about 1 km long, platforms 24–30 m below ground.
- Mumbai Metro Line 7A / 9, MMRDALead Design Checker, including Line 7A's 3.8 km underground link from Andheri East to CSMIA Terminal 2.
- Science Centre Metro Station to Worli PromenadeAbout 1,500 m pedestrian subway and vestibule via Mahalaxmi Racecourse. Design and construction support for J Kumar Infraprojects / MMRCL.
- Regal Cinema and CSMT pedestrian subways, MCGMAbout 300 m and 200 m subways in South Mumbai. Design, construction support and supervision.
- Dibba Bulk Handling Terminal, Fujairah, UAEStructural design of material-handling tunnels.
Frequently asked questions
What tunnel and underground projects has Syntegrity designed?
Syntegrity is the design review and support consultant for the BKC underground station on the Mumbai–Ahmedabad High Speed Rail (Package C1), Lead Design Checker for Mumbai Metro Line 7A / 9 including its underground section, and designer of pedestrian subways in Mumbai: Science Centre to Worli Promenade (about 1,500 m), Regal Cinema (about 300 m) and CSMT to Walchand Road (about 200 m).
Does Syntegrity check or proof-check tunnel and metro designs?
Yes. Syntegrity is Lead Design Checker for MMRDA's Mumbai Metro Lines 7A and 9 and Third-Party Verification Engineer on the Mumbai–Ahmedabad High Speed Rail EW1 package.
Where does Syntegrity work?
Syntegrity is headquartered in Andheri West, Mumbai, and works on projects across India and overseas, including the UAE and the Maldives.
How do I contact Syntegrity about a tunnel or subway project?
Email info@syntegrity.co.in or call +91 99207 21777.
You need the right direction
for your business, we’ll help you do that.
Address Business
302 ,UK Sangfroid , Off Veera
Desai Road, Andheri West,
Mumbai – 400 053
Why Partner with Us?
Our Featured Clients

















