Rail / Metro

successful project

Successful Projects in Rail / Metro

High-speed rail, metro and railway projects designed and checked by Syntegrity.

Mumbai Metro Line 7A – TBM Dhruv tunnelling
Mumbai Metro Line 7A/9
Underground and elevated extension of Mumbai's metro network for MMRDA – Line 7A's 3.8 km underground link from Andheri East to CSMIA Terminal 2, and…
Dahisar Railway Station Deck – view from north-east end (3D render)
Dahisar Railway Station Deck
Syntegrity Consulting is providing detailed design and construction support for the new steel station deck at Dahisar Railway Station, Mumbai, for Mumbai Railway Vikas Corporation…
Pedestrian Subway / Vestibule – Science Centre Metro Station to Worli Promenade
Pedestrian Subway / Vestibule – Science Centre Metro Station via Mahalaxmi Racecourse to Worli Promenade
Syntegrity Consulting is providing detailed design, architectural design and MEPF design for the pedestrian subway and vestibule connecting Science Centre Metro Station, via Mahalaxmi Racecourse,…
HSR BKC Terminal – 2.7 km Long Continuous Tunnel Completed with First Breakthrough in 21 km Tunnel between BKC and Shilphata for Mumbai Ahmedabad Bullet Train Project
HSR BKC Terminal
Syntegrity Consulting provided detailed design and design review of the enabling and temporary works for the high-speed rail terminal at Bandra Kurla Complex (BKC), Mumbai,…
North Central Railway – project image 2
North Central Railway
Syntegrity Consulting provided structural, architectural and MEPF design and construction support for traction substation, switching post and sub-sectioning post buildings on the Ghaziabad–Deen Dayal Upadhyay…
Bhuj Railway Station – project image 1
Bhuj Railway Station
Syntegrity Consulting provided structural, architectural and MEPF design for the Bhuj railway station redevelopment in Gujarat, including the terminal building, air concourse, platforms and three…
Traffic Simulation for MMI Plans - new
Traffic Simulation for MMI Plans
Syntegrity Consulting carried out traffic simulation studies for the multimodal integration plans of five stations on Mumbai Metro Line 2B, for MMRDA.
2024-02-03_MMI RENDER_1
Multimodal integration for Mumbai Metro line 2b
Syntegrity Consulting prepared the multimodal integration feasibility study and DPR for stations on Mumbai Metro Line 2B, for MMRDA.

Rail / Metro

Metro, railway and high-speed rail design consultants in India

Syntegrity Consulting designs and checks rail infrastructure across India: high-speed rail stations, metro lines, railway station decks and redevelopment, depots, traction substations and multimodal integration around stations.

Our roles range from detailed designer and design reviewer to Lead Design Checker and Third-Party Verification Engineer, for clients including MMRDA, MRVC, Western Railway, East Central Railway, North Central Railway and NHSRCL package contractors.

  • Detailed design of stations, decks and depots
  • Design checking and proof checking of metro works
  • Third-party verification of rail civil structures
  • Station redevelopment and foot over bridges
  • Multimodal integration and traffic studies

Key projects

  1. Mumbai–Ahmedabad High Speed Rail, BKC station (C1)Design review and support consultant for the only underground station on India's bullet-train corridor.
  2. Mumbai–Ahmedabad High Speed Rail, EW1Third-Party Verification Engineer for depots, traction substations and allied buildings along the 508 km corridor.
  3. Mumbai Metro Line 7A / 9, MMRDALead Design Checker for structural, civil, architectural and MEP design submissions.
  4. Dahisar Railway Station Deck, MRVCDetail designer of a ~180 m steel station deck with roof, staircases, escalators and lifts.
  5. Bhuj Railway Station redevelopment, GujaratArchitectural and structural design of a 12,000 m² terminal building, air concourse, platforms and three FOBs.

Frequently asked questions

What rail and metro projects has Syntegrity worked on?

Syntegrity is design review and support consultant for the BKC station on the Mumbai–Ahmedabad High Speed Rail (C1), Third-Party Verification Engineer on the EW1 package, Lead Design Checker for Mumbai Metro Line 7A / 9, and designer of the Dahisar station deck for MRVC, Bhuj station redevelopment, the Charkop depot shed for Metro Line 2 and multimodal integration for Metro Lines 9 and 2B.

Does Syntegrity provide design checking for metro projects?

Yes. Syntegrity is Lead Design Checker for MMRDA's Mumbai Metro Lines 7A and 9, reviewing structural, civil, architectural and MEP design.

Does Syntegrity work on railway station redevelopment?

Yes, including Bhuj station in Gujarat and Jamui, Barh, Jehanabad and Ara stations for East Central Railway under Gati Shakti.

How do I contact Syntegrity about a rail or metro project?

Email info@syntegrity.co.in or call +91 99207 21777.

You need the right direction
for your business, we’ll help you do that.

Address Business

302 ,UK Sangfroid , Off Veera
Desai Road, Andheri West,
Mumbai – 400 053

Contact With Us

Call us: +91-9920721777

Why Partner with Us?

Infrastructure-Focused Design Expertise
Problem-Solving with Precision
Strategic Technical Analysis
Technical Support
Qualified, Multidisciplinary Team
Value Engineering

    Schedule a Free Consultation

    Step 1 Step 2 Step 3

    Schedule a Free Consultation

    Step 1 Step 2 Step 3

    Schedule a Free Consultation

    Step 1 Step 2 Step 3

    To better assist you, please describe how we can help.

    Recognized by the best

    Our Featured Clients

    Here are some of the companies Syntegrity has empowered to forge ahead with confidence